ON-GOING

PROJECTS

Engineering Progress in Real Time


We are actively engaged in multiple projects that reflect our commitment to innovation, quality, and performance.

Polaris Data Center (Phase 1)

Scope of Work:

  • Testing, Adjusting, and Balancing

LUNA Data Center (Phase 1)

Scope of Work:

  • Testing, Adjusting, and Balancing

The Church of Jesus Christ of Latter-day Saints – Bacolod Project

Scope of Work:

  • Testing, Adjusting, and Balancing

Malolos to Clark Railway Project (MCRP) – Clark Depot

Scope of Work:

  • Third Party Testing and Commissioning (MEPF / Auxiliary / ELV)
  • Testing, Adjusting, and Balancing

Mandarin Oriental Hotel Project (Makati City)

Scope of Work:

  • Commissioning Management (MEPF / Auxiliary / ELV )

SM Six E-Com Center

Scope of Work:

  • LEED Commissioning

Levi Mariano Pumping Station and Reservoir

Scope of Work:

  • Third-Party Testing and Commissioning (MEPF / Auxiliary / ELV)
  • Testing, Adjusting and Balancing

Pearl Plaza Redevelopment Project

Scope of Work:

  • MEPF / Auxiliary System Audit and Retro-commissioning

University of the Philippines (Baguio Innovation Hub)

Scope of Work:

  • Mechanical / Plumbing and Drainage Design Consultant

COMPLETED

PROJECTS

Engineering Progress in Real Time


R1BSS has completed major projects, delivering expert MEPF design,  commissioning, and TAB services with proven excellence.

Testing, Adjusting and Balancing

The Church of Jesus Christ of Latter-day Saints –Davao Project

Scope of Work:

  • Testing, Adjusting, and Balancing

SM Five E-Com Center

Scope of Work:

  • Fresh Air System Survey / Verification and Measurement for LEED Certification

SM Four E-Com Center

Scope of Work:

  • Testing, Adjusting, and Balancing
  • MEP Construction Management

Philip Morris RRP Building Extension

Scope of Work:

  • Testing, Adjusting, and Balancing

New Ballroom – Solaire Resort and Casino

Scope of Work:

  • Testing, Adjusting, and Balancing

New Solaire Club – Solaire Resort and Casino

Scope of Work:

  • Testing, Adjusting, and Balancing

Sofitel Philippine Plaza Manila

Scope of Work:

  • Ventilation System Survey / As-Built
  • Testing, Adjusting, and Balancing

JG Summit Petrochemical

Scope of Work:

  • Testing, Adjusting, and Balancing

The Lyfe Tower

Scope of Work:

  • Testing, Adjusting, and Balancing

Torre Lorenzo

Scope of Work:

  • Testing, Adjusting, and Balancing (Air Side)

Trans-Asia Construction Development Office

Scope of Work:

  • Airconditioning System Survey / As-Built
  • Testing, Adjusting, and Balancing

Testing and Commissioning / Commissioning Management / LEED Commissioning

 Solaire North Hotel and Resort

Scope of Work:

  • Third Party Testing and Commissioning (MEPF / Auxiliary)

MINCA Inc. – Cebu Office Project (LEED Gold Certified)

Scope of Work:

  • LEED Consultancy
  • LEED Commissioning

Discovery Samal Hotel & Resort

Scope of Work:

  • Third-Party Testing and Commissioning (MEPF / Auxiliary)
  • Testing, Adjusting, and Balancing

Ulticare Medical Center

Scope of Work:

  • Third Party Testing and Commissioning (MEPF / Auxiliary / ELV)
  • Testing, Adjusting, and Balancing

Z2 Tower

Scope of Work:

  • Third Party Testing and Commissioning (MEPF / Auxiliary / ELV)

NARRA 1 – 10 MW Data Center

Scope of Work:

  • Electrical Testing and Commissioning
  • State Point Liquid Cooling System (SPLC) Commissioning

Makati Circuit Tower

Scope of Work:

  • Electrical Testing and Commissioning

Design

 University of the Philippines (College of Music)

Scope of Work:

  • Mechanical, Plumbing, and Fire Protection System Design Consultancy

Calauan Socialized Housing Project

Scope of Work:

  • Mechanical and Fire Protection System Design Consultancy

 Solaire North Hotel and Resort

Scope of Work:

  • Design Management