ON-GOING
PROJECTS
Engineering Progress in Real Time
We are actively engaged in multiple projects that reflect our commitment to innovation, quality, and performance.

Polaris Data Center (Phase 1)
Scope of Work:
- Testing, Adjusting, and Balancing
LUNA Data Center (Phase 1)
Scope of Work:
- Testing, Adjusting, and Balancing
The Church of Jesus Christ of Latter-day Saints – Bacolod Project
Scope of Work:
- Testing, Adjusting, and Balancing
Malolos to Clark Railway Project (MCRP) – Clark Depot
Scope of Work:
- Third Party Testing and Commissioning (MEPF / Auxiliary / ELV)
- Testing, Adjusting, and Balancing
Mandarin Oriental Hotel Project (Makati City)
Scope of Work:
- Commissioning Management (MEPF / Auxiliary / ELV )
SM Six E-Com Center
Scope of Work:
- LEED Commissioning
Levi Mariano Pumping Station and Reservoir
Scope of Work:
- Third-Party Testing and Commissioning (MEPF / Auxiliary / ELV)
- Testing, Adjusting and Balancing
Pearl Plaza Redevelopment Project
Scope of Work:
- MEPF / Auxiliary System Audit and Retro-commissioning
University of the Philippines (Baguio Innovation Hub)
Scope of Work:
- Mechanical / Plumbing and Drainage Design Consultant
COMPLETED
PROJECTS
Engineering Progress in Real Time
R1BSS has completed major projects, delivering expert MEPF design, commissioning, and TAB services with proven excellence.

Testing, Adjusting and Balancing
The Church of Jesus Christ of Latter-day Saints –Davao Project
Scope of Work:
- Testing, Adjusting, and Balancing
SM Five E-Com Center
Scope of Work:
- Fresh Air System Survey / Verification and Measurement for LEED Certification
SM Four E-Com Center
Scope of Work:
- Testing, Adjusting, and Balancing
- MEP Construction Management
Philip Morris RRP Building Extension
Scope of Work:
- Testing, Adjusting, and Balancing
New Ballroom – Solaire Resort and Casino
Scope of Work:
- Testing, Adjusting, and Balancing
New Solaire Club – Solaire Resort and Casino
Scope of Work:
- Testing, Adjusting, and Balancing
Sofitel Philippine Plaza Manila
Scope of Work:
- Ventilation System Survey / As-Built
- Testing, Adjusting, and Balancing
JG Summit Petrochemical
Scope of Work:
- Testing, Adjusting, and Balancing
The Lyfe Tower
Scope of Work:
- Testing, Adjusting, and Balancing
Torre Lorenzo
Scope of Work:
- Testing, Adjusting, and Balancing (Air Side)
Trans-Asia Construction Development Office
Scope of Work:
- Airconditioning System Survey / As-Built
- Testing, Adjusting, and Balancing
Testing and Commissioning / Commissioning Management / LEED Commissioning
Solaire North Hotel and Resort
Scope of Work:
- Third Party Testing and Commissioning (MEPF / Auxiliary)
MINCA Inc. – Cebu Office Project (LEED Gold Certified)
Scope of Work:
- LEED Consultancy
- LEED Commissioning
Discovery Samal Hotel & Resort
Scope of Work:
- Third-Party Testing and Commissioning (MEPF / Auxiliary)
- Testing, Adjusting, and Balancing
Ulticare Medical Center
Scope of Work:
- Third Party Testing and Commissioning (MEPF / Auxiliary / ELV)
- Testing, Adjusting, and Balancing
Z2 Tower
Scope of Work:
- Third Party Testing and Commissioning (MEPF / Auxiliary / ELV)
NARRA 1 – 10 MW Data Center
Scope of Work:
- Electrical Testing and Commissioning
- State Point Liquid Cooling System (SPLC) Commissioning
Makati Circuit Tower
Scope of Work:
- Electrical Testing and Commissioning
Design
University of the Philippines (College of Music)
Scope of Work:
- Mechanical, Plumbing, and Fire Protection System Design Consultancy
Calauan Socialized Housing Project
Scope of Work:
- Mechanical and Fire Protection System Design Consultancy
Solaire North Hotel and Resort
Scope of Work:
- Design Management